August 22, 1973.
~N~HORAGE
Mr. Glen A. ~Mf.f
Contracting Engineers & Associates
1801 Stanton Avenue
Anchorage, Alaska
SUBJECT: Sanitary Sewer Extension, bMrray &lbdivision, Blks. I & J
Dear Mr.
The pla~s and specifications for the subject project are approved
for the features with which this department ii concerned.
Yours
Kyle g. Cherry, P.E.
Regional Envirormlental Engineer
cc: GAAB-DEQ ~
i~'~arch 30, ]973
Subject: i;acter'i~lo!'!ical !!ater A~alysi:~ !.i~, iii. J, i~urriw S/U
arid l.~rs. ~,uckw~'J~ers:
t~f Hatch 27, 1973),
Please cont~c~ ~his office uiie.q chturination hc~s !man cor~pleL~,:d
and Ci~ w~t(?r pip(;s t;t~a~md so another water ~a~l:,i~: can be takun.
office
Si,qceJ,~ly ~
Denise C. [~ashaw
Envirom;~ental rSoni;rol Officer II
j$
DEPT. OF ENVIRON~IENTAL CONSERVAT~[ON
December 14, 1972.
WILLIAM A. ESAtl, GOVERtlOR
SOUTI'ICENTRAL REGIONAL OFFICE
MACKAY BLDG.
338 DENALI STREET
ANCHORAGE 99S01
Mr. Glen A. Huff
Contracting Engineers & Associates
1801 Stanton Avenue
Anchorage, Alaska
SUBJECT: Revised Plans -Murray Subdivision, Blks. I & J
Sanitary Sewer System
Dear Mr. Huff:
We have reviewed the revised iplans for the subject
project and they are approved for the features With
which this department is concerned.
Yours truly,
Regional Environmental Engineer
KJC/cg
cc: GAAB-DEQ
DEPT. OF ENVIRONMENTAL CONSERVATION
November 22, 1972.
Mr. Glen A. fluff
Contracting Engineers & Associates
1801 Stanton Avenue
Anchorage, Alaska
/
$OUTHCENTRAL REGIONAL OFFICE
MACKAY BLDG.
338 DENALI STREET
ANCHORAGE 99501
WILLIAM A. £GAN, GOVERNOR
SUBJBCT: Murray Subdivision, Blks I & J -Sewer System
Dear Mr. Huff:
We have comple, ted our review of the plans for the subject
project and with the understanding that the conditions
listed below are met, the plans and specifications for
the project are approved for the features with which this
department is concerned:
1)
A drop type manhole will be required for
manhole 3-B because of the height of the
8" line above the manhole invert.
z)
All stream crossings shall be constructed
in such a manner as to cause no violation .
of the Alaska Water Quality Standards. The~e
crossings also must meet the requirements of
the Alaska Dept. of Natural Resources, Water
Resources Section and the Alaska Dept. of
Fish & Game, Habitat Section.
5)
As much of the proposed sewer line construction
closely follows a tributary of Little Campbell
Creek, we would at this time request you to
advise the successful bidder that precautions
must be taken to prevent the discharge of
silt-laden water into this stream. Failure
of the contractor to provide for treating
the water pump from the sewer trench will
result in a vigorous enforcement action by
this department, if a violation of the Alaska
Water Quality Standards is involved. Due to
the classification of the stream it will be
very difficult to pump the water from a trench
into the stream directly without some type
treatment and not cause a violation of the
Water Quality Standards.
Mr. Huff -2- November 22, 1972.
If you have any question regarding the above, please feel
free to contact me at your convenience.
Yours truly,
Regional Environmental Eng±neer
Bob Bursiel
Water Resources Section, ~DNR
Bob WeinRold
Habitat Section, ADF&G
SAAB-. DEQ /
i)ovember 2~)~ 1
Conl;ractin9 En?ineers & Associates
;qnch o)"~$10, Alaska
At~e:~tioi'~: Hr, Gle~n Huff
Subjccc: S(;wtqr Trunk l:ix~,ension a~'~J l.a~erial !mnrovemen'~.s
In riurray Subdivision
Dear Mr. Huff:
The Gr<.a~er t\,~ch(~rage Area Ror~uqil~ ii~narbmei~i: of [nvirnnmentp~l
Quality ~ias rec<:ived and reviewe,l th~ en(~ineering ~)lans for
smb,jccl: i~r~.jec~,, Our review s:~ows
all c(}ndil.:ions wi[,~l Which L)i'Js jj()p~lrLl,leH[; is (:!)ncerned.
ShoLll(J you have aYL~ questions reflardinfl our review'of Chese mla~ls,
pl ease co)~tac C tile undersi grle~.
Si ncerely,
Roll Strickl[~nd,
Chi(:f Sa~itarian
hh