Loading...
HomeMy WebLinkAboutUPLANDS PH 3 LT 2Onsite File vpIands rs Municipality of Anchorage On-Site Water and Wastewater Section • (907) 343-7904 Page of ON-SITE WASTEWATER INSPECTION REPORT Permit Number: OSP211215 PID Number: C9.5-0 — i`�I/ - 6S_ Dwelling: X Single Family (SF) ❑ with ADU ❑ Duplex (D) ❑ Two Single Family Project: ■❑ New ❑ Upgrade Name Laura Trejo ABSORPTION FIELD 0 Deep Trench ❑ Wide Trench ❑ Bed ❑ Mound Site Address 20900 Upper Lowland Ave. Eagle River, AK ❑ Other Phone Number of Bedrooms Soil Rating depth from original grade 907-357-6760 4 1.2 GPD/SF JTotal 8.5' Ft. LEGAL DESCRIPTION Depth to pipe invert from original grade 2,5' Ft. Gravel depth beneath pipe 6 Ft. Subdivision Block Lot Uplands Phase 3 --- Lot 2 Fill added above original grade 4' Ft. Gravel length 45' Ft. Township Range Section Gravel width 2' Ft. Beds: Number of Lines 0 Distance between lines Ft. SEPARATION DISTANCES To Septic Absorption Lift Station Holding Sewer Total absorption area Number of trenches Dist. between trenches From Tank Field Tank Line 540 Ft z 1 Ft. Well _ _ _ _ _ TANK X Septic ❑ S.T.E.P. ❑ Holding ❑ Other Manufacturer Greer Tank Capacity 1250 Gal. Surface Water 1001+ 1001+ _ _ Material Number of compartments Lot Line 53' 8' - - NA HDPE 2 Foundation 12' 13' _ ( _ LIFT STATION Manufacturer Capacity Remarks The area has been graded and stabilized with a BFM and seed. Gal. Existing well located on property to the south about 155' from tank Alarm location Electrical installed by PIPE MATERIAL House to tank 3034 Tank to drainfield 3034 Installer Anderson Construction & Engineering ALL PIPE PVC ASTM 3034 Drainfield 3034 CO/MT3034 Inspector Scott Pyle (TBC) BENCH MARK (Assumed elevation) 806.95 ft Inspeection 1-` 6/23/2021 6/25/2021 Location and description 2nd ction 3b 6/25/21 41h 10/18/2$ NW building corner hub ON-SITE WATER AND WASTEWATER SECTION APPROVAL Engineer's Stamp Conditional Approval: Date ­1-'oo.`49 m ;;�,q-�''-='--; d of TI"AQTHY.1.ALLEY �� m ►p �, .� ,o/ E 313 Septic S stem Approve Date � ZZ Note: this approval does not include well permit requirements. tKev u5ru2n6t RECORD DRAWINGS THESE RECORD DRAWINGS REPRESENT AS -CONSTRUCTED UPPER L 0 K D AVENUE GENERAL: CONDITIONS TO THE BEST OF MY PROFESSIONAL L-17.57 1. THE SCOPE OF THIS PROJECT INCLUDED THE INSTALLATION OF A 1250 GALLON SEPTIC TANK AND ABSORPTION TRENCH TO KNO.. JUNE 28, 2022 L-45,54 R-30.00 SERVE THE PROPOSED FOUR BEDROOM RESIDENCE LOCATED ON THE REFERENCED PROPERTY. DESIGN CRITERIA: '"� R`50,00 2. CONSTRUCTION WAS COMPLETED, TO MY PROFESSIONAL KNOWLEDGE, AS SHOWN HERE -IN, IN ACCORDANCE V.I7H THE 4 BEDROOM = 6Q0 CPD DATE: APPROVED SITE PLAN AND DESIGN DRAWINGS. MUNICIPAL PERMIT WITH ANY SPECIAL PROVISIONS OR CONDITIONS, AND ALL - - APPLICABLE STATE AND MUNICIPAL WASIEVIA TER DISPOSAL REGULATTONS. SOILS: 1.2 GPD/SOFT TIMOTHY LEY, PE / i�azo 3. UPON COMPLETION OF THE SYSTEM, M 600/1.2 = 500 SOFT E CONTRACTOR STABILIZED THE FINISH GRADE PATH HYDRAULICALLY APPItfO BONDED F78ER 14ATR/X MULCH AND SEED. THE PROPERTY OWNER VALL 8£ COMPLETING FUTHER LANDSCAPING IMPROVEMENTS AT A TRENCH INSTALLED PER DESIGN: LATER DATEEFFEC �.,L ,• } SEP RC TANK /NSTALLA 77ON.• 6' K707H Ir DEPTH s 2' 707N L A SEP77C TANK WAS CONSTRUCTED CONSTRUCTED BY GREER WITH A 20' RISER FOR THE FIRST COMPARTMENT AND A 4' 45' LENGTH CLEANOUT FOR THE SECOND COMPARTMENT. PROPERTY AND NEIGHBORING PROPERTIES SERVED BY _ 2. ALL STANDPIPES/RISER ON THE SEP77C TANK WERE EXTENDED A MINIMUM OF 12 INCHES AHOY£ FINAL GRADE. TANK RISER AWWIJ WATER SYSTEM. WAS SET AT FINAL GRADE, WITH POSITIVE DRAINAGE AROUND THE PERIMETER OF RISER COVER. APPROXIMA IF LOCATION OF THE WATER SERVICE TO THIS LOT IS SHOVAN HEREIN.- __,.___.:_..--- 10' T&E EASEMENT } J. SEPTIC TANK WAS INSTALLED WITH GREATER THAN 4' OF COVER. A FOUNDATION CLEANOUT WAS INSTALLED t2' FEET FROM THE NO WELLS EXIST W77741N 200' OF SEPTIC SYSTEM. 1 BUILDING FOUNDATION. IN 7N£ LINE BETWEEN 7H£ TANK AND THE L£ACHAELD TWO CLEANOUTS WERE ISNTALL£0. THESE CLEANOU7S WERE LOCATED ON UNDISTURBED SOIL NOT MORE THAN 10' FROM 7Nf TANK. THE FIRST CLEANOUT, 1N LINE, TO CLEAN TOWARD THE LEACHFI£LD. THE SECOND CLEANOUT TO CLEAN TOWARD THE SEPTIC TANK. L=17.57 -•r, 4. FINAL GRADING OVER THE SEPTIC TANK WAS COMPLETED TO PROVIDE POSITIVE SLOPE AWAY FROM THE SEPTIC TANK. -.,_ T= .. R=30.0 .. 1 ". WATER cR�9CR LOCATiCN APPRX�liATE-'"`� 'TEMP BENCHMARK\ � '- � ) � •" \ fffJBLDG, CORNER REFERENCE HUB \"�-If ABSORPTION TRENCH/ORAINFl£LO INSTALLATION: / ELV = 806.95 , 5. ABSORPTION TRENCH WAS COMPLETED /N LOCATION SHOWN HEREIN THE BOTTOM OF THE EXCAVATION WAS WITHIN 2 INCHES OF LEVEL. SIDE WALLS OF THE TRENCH WERE ROUGHED AS NEEDED PIOR TO PLACEMENT OF DRAIN ROCK 6. AFTER DRAIN ROCK WAS ISNTALLfD, THE D/SIR/BUTTON PIPE WAS LAID LEVEL WITH THE P£RFQRA TONS FACED DOWNWARD. GRAVEL WAS THEN PLACED OVER THE DISTRIBUTION PIPE TO PRONDf A MINIMUM OF 2 NICHES OF COVER OVER THE PIPE. 7 A SILT BARRIER WYAS INSTALLED BETWEEN THE FINAL GRAVEL LAYER AND THE NATIVE SOIL BACKFILL. THE SILT BARRIER COVERD y THE ENTIRE GRAVEL SURFACE BEFORE PLACING BACKFILL. { �\ H. MONITOR TUBES ARE FOUR (4) INCH DIAMETER AND INSTALLED APPROXIMATELY IN THE LOCA77ONS SHOWN HERIN. THE PORTION OF rl p THE MONITORING LUBE EXTENDINGISE THROUGH THE GRAVEL WA5 PERFORA IED FROM IHE BOTTOM OF THE TRENCH 70 THE INVc'RT Of• � --- � .'' O- PROPOSED BLDG THE OfS7R/BUTION PIPE THIS IS EQUIVALENT TO THE EFFECTIVE DEPTH OF THE GRA VEL AS N07ED ON THE DESIGN. \ 30' TEST HOLE RA01}/g 1 BACKFILL OVER THE TRENCH IS GREATER THAN 4' DEPTH V- 9.. _ GFF = 816,42 `r/ 1dAT£RIAL SPfCIFICA7/ONS \ -� .. -- __ ,_ - -- tO, A 1,250 GALLON HDPE TANK MANUFACTURED BY GREER TANK IN ACHORAGE WAS INSTALLED. 11. ALL PIPING INSTALLED WAS 4" PVC ASTM 3034. PERFORATED PIPE WAS USED FOR THE ORAINF/LED AS SHOWN.�,6?\ ^ \ / 4"-6 CLEANOUT IE=797.24 12. SEP77C TANK INLETS AND OUTLETS WERE FITTED WITH WATER77CHT COUPLINGS (CAULDER, FERNCO, OR EQUAL). ' A5�Y / -..,,` 5,75 LF 4"-© PVC SS PIPEn` Al - "-0 PVC SS PIPE --V --- 13. A PERMEABLE NONTOXIC SILT BARRIER (TYPAR 3401, M/RAF) 140/N, OR EQUAL) WAS INSTALLED BETWEEN THE FINAL LfACHRELD �N �"` \\ 45'/6' ED DEEP TRENCN� ••-^`��- ""-- -'- GRAVEL LAYER AND THE NATIVE SOIL BACKFILL. •'^•IE=796.14 74. ALL LEACHFIELD GRAVEL (SEVWfR ROCK) WAS 0.5"-2.0" SCREENED GRAVEL WITH LfSs THAN i9. PASSING THE {200 SIEVE 6.90 LF 4"-0 PV_ SS PIPE SS OLERA `-4' 0-90' ELBOW IE -797.135 `^ _....� _._ .60 LF 4 -0 PITC 55 PIP,. �10 23 ...._. E.. `" REPLACEMENT ABSORPTION AREA (PRIOR TO REPAIR AND USE OF THE REPLACEMENT `- TANK INLET IE=796.65 �•-' >_- '-- AREA, A TEST HOLE AND PERCOLATION TEST WILL BE "'TATK OUTLET IE=796.49 REQUIRED TO VERIFY DESIGN REQUIREMENTS 4" 0-45' ELBOW IE=796.28 ' 4"-0 DOUBLE CLEANOUT IE=796.45 6.56 LF 4"-0 PVC SS PIPE • 5O ANY VEGETATION THAT IS DISTURBED DIRECTLY DOWN GRADIENT FROM ABSORPTION SYSTEM SHALL BE REPLACED WITH EROSION CONTROL VEGETATION y --._._ ---- �-_.._., PROPOSED BLDG ADDITIONAL PERCOLATtota TEST LOCATION, SEE LOG DATED 6/23/2021 _- - - GFF = 816.42 -__.__-_,_ _ __ - ____- __ NEAREST WELL LOCATED a4' IT" _„_-_"- ,_. LOT 2 ------41,811 Sq. Ft. 60 Acres S - `\ V N89'5Y1t'B' 397.18' 20' DRAINAGE EASEMENT N89'57'11'W 397.18' ,° �� CO/MT SWING -TIES J7 sassT 'AS MEASURED ONSITE o /o zo _\\y '(�....._,qS 11 LAURA TREJO 20900 UPPER LOWLAND AVE. TREJO RESIDENCE FIELD BOOKS BM N0. LOCATION ELEV. DATA ¢, DATA a'"' s. REVI DATE - DESCRIPTION BY REV ig`P' •y+j SEPTIC RECORD DRAWING DESIGN: BASE TBC TELEPHONE --- �'k• '•*+l t1Z� TOPOGRAPHY TBG ELECTRIC --- 3••::•• ••.:_; STARING: PROFILE ___ CABLE N ---g tC in SANITARY SEWER --- TRAFFIC SIGNAL --- �npant, 801 E�SJtehgyPlae 10 A othy J. ty' CE14368 r(1 EAGLE RIVER, AK .'ry. STORWATEM SEWER h o -52 - 11" '`gneL aESIQUA CONTRACTOR: BASIS OF DATUM: ___ RE5 TBC L1cen>.e No. C HDR. 1'=24' SCALE VER' N/A 06/23/22 GRID: N/A C"� SHEET C,2 INSPECTOR: GAS JDALE: STATUS: CONSTRUCTION DRAWINGS CONSTRUCTION RECORD VERTICAL DATUM PLAN CHECK REVISIONS CONSULTANT SEAL 0 TEMP. BENCHMARK REFERENCE POINT FOR NORTHWEST FOUNDATION CORNER SEPTIC SYSTEM PROFILE NO TUBES IN LINE ------------- -_ 795 FROM 4"a SOLID PVC ---F785 RECORD DRAWINGS THESE RECORD DRAWINGS REPRESENT AS -CONSTRUCTED CONDITIONS TO THE BEST OF MY PROFESSIONAL KNOWLEDGE AS -0 28, 20 2. DAT *Z- TlMf5-THY ALLFy PE TREJO RESIDENCE FIELD BOOKS BM NO. LOCATION ELEV. DATA M er" DATA - s. REV DATE DESCRIPTION BY REV ,iy'�P DESIGN: BASE TBG TELEPHONE --- *: * LAURA TREJO STAKING: --- PROFILE TBC CABLE TV --- g� ,„, �((t G, P,�Y �� m IhY, II�� 20900 UPPER LOWLAND AVE. SEPTIC PROFILE SANITARY SEWER --- TRAF'fiC SIGNAL --- 801 E 34It�h 10 �''No. CE ;" / -eua T: STORM SEWER --- DESIGN TBC ^ ++,, ";T EAGLE RIVER, AK RECORD DRA WING DATE: 0 C2 CONTRACTOR: BASIS OF DATUM: WATER --- QUANTITIES TOC yOR_ i�_t0• /28/22 GRID: N/A INSPECTOR, GAS --- SCALE VER. 1^=5• SHEET CONSTRUCTION RECORD VERTICAL DATUM PLAN CHECK REVISIONS CONSULTANT SEAL STATUS: CONSTRUCRON DRA"NGs C2 X LLJ < w U� m < Z ISVHcJ Z w < :E w NOISIAi(ions SGNV�dn LJ Z) C, < CD P= m .................. t< 8. CX !XQ << 'p, w Lj < Q) 0 2 :E — - — - — — At\ I co 7w7v 2: —r- K --------------------- C '21,z6f M,,II,Zg.62N o 4, Q-. -..s V) EL E r- I 01=1 M , 0-00 ci u 2! 'm o 2f 00- 1 0 -C > 0 V) OE LLJ LLJ LL-D� g a (U 1-00 L) -C C) P, Ck- C 0 0) >, - -aQ) to �t 0 _r_ z -C = e 0- 0 U ui t W O.0 :Z) aw > LL < WSW a) o 0 __p c -a -�2 -� . 80_6 0 tgl) — C) (, , =, .. , , LL, R LLJ c) c, 2 oc ;--z n 2 E -0.0' Z CQ- ot.- C: ul --o < 0 0 F 002--- <, 16 �S 0) (0,-0 CLv < J- L :3 0-0 -1 — . E , O.E C�"Nzl Ab W 1, ti 0 0 0- CN n z CD w Cc g LL o I V3(:j loe 0 V) C 0 0 > LLJ 2 vi C) :lj- AO& n bcl 1) L) 0 -3 LLJ 0 C2 > C, -C CL -K �K C) -,Q x g 0 w (01 ..-2 :V:)) rL CS Z, w ................. F- . O09 ... ........ .. ....... . Q 0 LO m 69 z D.... C) ...... z . ....... . ............... n C) . ........ C) "**' -- .... I "- V-- ................ 7-%-.Ln ....... ...... .................... ...... .... Lo ........ ....... ............ a) .. . LO 4=1 C\j .. ............... ---r— C\l 0 ............... 0 ........... -j LO .............. cu 0 0 U- CN 0,0 Ma 'm ... ... ...... 0 EL- 0 ur) mD :E IV, I,- ......... 0 U-) lz < ap co 'S I Ij C: Q :pe CD z C? w 0 co a: a. t+ :ts moi„ Alaska 99654 June 28, 2022 On-site Water & Wastewater Section Development Services Department Municipality of Anchorage 4700 Elmore Road Anchorage, AK 99507 RE: Request for Waiver not Submitted with COSA or Permit Uplands Subdivision Phase 3 Lot 2 On behalf of Laura Trejo, The Boutet Company has prepared the attached record drawings in pursuit of an approval to operate a domestic onsite wastewater system. During construction, the system was shifted approximately 1.5 feet to the west to accommodate the plumbing in the interior of the foundation. The system construction was completed as designed resulting in a 8.5 foot separation from the end of the absorption trench and the western property line (See attached Record Drawings). The approval of this waiver will have little to no impact on the adjacent property. The absorption trench has an effective depth of 6' requiring a separation of 12' from adjacent trenches. This separation is maintained due to the remaining 8' separation from the end of the trench to the property line and the required 10' separation from the future septic on the adjacent lot to the property line. On behalf of the owner, Laura Trejo, I hereby request approval of this waiver and to operate the septic system for the subject property. I am happy to answer any further questions that you may have and look forward to your response. Sincerely, Tim Alley, PE Civil Engineer The Boutet Company, Inc. Office: (907) 357-6760 Mobile: (907) 830-2821 Email: talley@tbcak.com Attachments: Waiver not Submitted with COSA or Permit Form Septic System Inspection Report Septic System Record Drawing Plan Septic System Record Drawing Profile As -built Survey Municipality of Anchorage n�s° P.O. Box 196650 • 4700 Elmore Road Anchorage, Alaska 99519-6650 a (907) 343-7904 • Fax (907) 343-7997 http://www.muni.org/Onsite Development Services Division On -Site Water and Wastewater Program * * * * VARIANCE/WAIVER REVIEW * * * * Waiver#: OSV221044 COSA PID#: 050-474-65 Legal Description: Uplands # 3 Engineer: Timothy Alley Applicant: Laura Trejo Permit#: OSP211215 Your request for a waiver of the required 10 feet horizontal separation from the drain field to the lot line has been approved. The approved separation distance is 8. This waiver approval applies to the Existing Trench only. Any future upgrade to the on-site wastewater disposal system will require all separation distances be met or another approval from this department ❑The affected adjacent property owner(s) have been given a 7 -day notice regarding this waiver. ❑ Notarized letter(s) of nonobjection have been received from the owner(s) of the affected adjacent property. [%� Adj acent properties are not affected by this waiver. Waiver is Granted: X Waiver is not Granted: Date: [ �v Approved b . Name of R viewer **** VARIANCE/WAIVER REVIEW **** �.2 Z �3- ( -,i J 7 �S�zo 2 ?__ E d1'7q MUNICIPALITY OF ANCHORAGE On -Site Water & Wastewater Program PO Box 196650 4700 Elmore Road Anchorage, Alaska 99519-6650 Phone: (907) 343-7904 Fax: (907) 343-7997 http://www.muni.org/onsite On -Site Wastewater Disposal System Permit Permit Number: OSP211215 Work Type: Septic Initial Tax Code Number: 05047465000 Site Legal Address: UPLANDS PH 3 LT 2 G:0057 Site Mailing Address: 20900 UPPER LOWLAND AVE, Eagle River Owner: SMITH PHYLLIS FAMILY IRREVOC Design Engineer: TBC INC This permit is for the construction of: Effective Date: Expiration Date: went `o Srh � n s Ueparnnent Lot Size in Sq Ft: Total Bedrooms: 6/17/2021 6/17/2022 41811 Q Disposal Field Q Septic Tank ❑ Holding Tank ❑ Privy ❑ Private Well ❑ Water Storage All construction shall be in accordance with: 1. The attached approved design. 2. All requirements specified in Anchorage Municipal code Chapters 15.55 and 15.65 and the State of Alaska Wastewater Disposal Regulations (18AAC72) and Drinking Water Regulations (18AAC80) 3. The wastewater code requires inspections during the installation. The engineer shall notify the Development Services Department per AMC 15.65. Provide notification by calling (907) 343-7904 (24/7). 4. From October 15 to April 15, a subsurface soil absorption system under construction during freezing weather shall be either: a. Opened and Closed on the same day, or b. Covered, sealed, and heated to prevent freezing E ial Provisions: entire subsurfacedisposal field and/or alternate is not within a 30 foot radius of a percolationtest. The eer needs to do anadditional percolation test prior to the construction of the septic field. Please submit ed and signed results withthe As -built Inspection Report. If theresults require a design change, ruction of the system will stop pendingOn-Site review and approval. Received B Issued By: y: Date: Date: RUSH MUNICIPALITY OF ANCHORAGE Development Services Department Phone: 907-343-7904 On -Site Water & Wastewater Section �- Fax: 907-343-7997 ON-SITE SEPTIC/WELL PERMIT APPLICATION Parcel I.D. 050-474-65-000 Property owner(s) Laura Trejo Mailing address 19 Shelby Ranch Court, Roseville, CA 95678 Site address 20900 Upper Lowland Ave., Eagle River Day phone 805-843-5450 Legal description (Sub'd., Block & Lot) Uplands Phase 3 Lot 2 Legal description (Township, Range & Section) Lot Size 41,811 Sq. Ft. Number of Bedrooms 4 APPLICATION IS FOR: APPLICATION IS AN: TYPE OF DWELLING: (M all that apply) Absorption Field 0 Initial 0 Single Family (SF) El (w/wo AD U) Septic Tank Q Upgrade F1Duplex (D) ElHolding Tank ❑ Renewal ❑ Multiple Dwellings ❑ Privy ❑ (SF and/or D) Private Well ❑ Water Storage ❑ THIS APPLICATION INCLUDES A WAIVER REQUEST FOR: Distance: I certify that the above information is correct. I further certify that this is in accordance with applicable Municipal Codes. (Signature of pe6perty owner or authorized agent) Permit/Rush Fees: I q5% Date of Payment:__ Z912 I Receipt Number: 0Z61)6r- Permit No. 05P 2 I I Z 15 Waiver Fees: Date of Payment: Receipt Number: Waiver No. GADevelopment Services\Building Safety\On Site Water and Wastewater\Forms\Client Forms\Permit Application.doc /a, The Boutet Company, Inc. Phone 907.357.6770 1508 E. Bogard Road, Unit #7 www.tbcak.com Wasilla, Alaska 99654   June 15, 2021    On‐site Water & Wastewater Section  Development Services Department  Municipality of Anchorage   4700 Elmore Road   Anchorage, AK 99507  RE: Engineer Narrative On‐site Wastewater Septic System  Uplands Subdivision Phase 3 Lot 2     On behalf of Laura Trejo, The Boutet Company has prepared the following submittal in pursuit of an  approval for a domestic onsite wastewater system supporting the construction of a single‐family  residence located at 20900 Upper Lowland Avenue, Eagle River, AK; Legal description: Uplands  Subdivision Phase 3 Lot 2.    The residence to be constructed will be a 4 bedroom, approximately 4,700 square foot (sq. ft.) two story  house with a walkout basement and attached garage. The residence will be served by municipal water  and will require an on‐site wastewater (septic) system for sewage treatment and disposal.     The site topography has proven difficult for development. The entire lot slopes away from Upper  Lowland Avenue with existing slopes ranging from 25% to 45%. A drainage easement is located from the  northeast property corner to the southern property line and turns to run along the southern property  line to provide drainage to a retention area to the west. The drainage easement provides a naturally  vegetated swale for surface water to travel within to a retention/detention pond, approximately 120  from the nearest portion of the designed absorption systems.    A geotechnical investigation and percolation testing for the subdivision was completed on October 25,  2018 by Forge Engineering (geotechnical report excerpts attached). Test holes 3 and 4 were located  within the subject lot to the northwest corner. Percolation testing resulted in rates of 4 minutes per inch  and 1.16 minutes per inch, respectively. No groundwater was encountered in either test hole, nor  bedrock.    The septic system will incorporate a 1,250 gallon HDPE septic tank and 45‐foot long absorption trench  with an effective depth of 7 feet. The system has been located on the lot on a 25‐37% slope within 30  feet (ft) from test hole 4 and approximately 75 ft from the drainage way along the southern boundary.  No existing wetlands are located within 200 ft of the planned septic location. A private well is located  approximately 150’ due south of the proposed absorption system. Percolation testing was completed 4‐5  feet from existing ground surface and is approximately 3’ uphill from the infiltration trench. Due to the  onsite topography substantial fill will be required to construct the residence the infiltration trench and  septic tank will be located near the existing ground surface elevation to ensure the tank backfill does not  exceed the maximum burial depth of 10 feet. The absorption trench has been sized per the requirements  of AMC Chapter 15.65 for soil percolations rates of 1.16 minutes per inch at 1.2 gallons per day per  square foot (gpd/sq. ft.) and 150 gallons per bedroom per day. The absorption trench has been oversized  to help longevity of the system due to the location and burial depth.  The absorption system conforms to the “Steep Slope” provisions of AMC:   Slope does not exceed 46%   Adequate vertical separation distances exist.   Trench design to utilize a 24” width; less than 60”.   Plan addresses disturbed vegetation and the requirement of erosion control vegetation.   No slopes greater than 46% exist down gradient from the absorption system.   The distribution pipe is designed to depth greater than 36” below the natural organic layer.    The reserve area for a replacement absorption system is located outside of the 30’ radius of the Test Hole  #4.  If/when this area is utilized, a new test hole will need to be advanced to confirm underlying soils.    The design incorporates best practices and industry standards, as well as adheres to AMC.  These  practices should prove to provide a long‐lasting system, assuming proper maintenance.  However, if a  catastrophic failure occurred, effluent could potentially find its way to the drainageway and being  impounded within the detention pond area.  Approval from the neighboring property owner to the south  would be required to remediate such a failure.  It is the opinion of this engineer, that the likelihood of  such an event is well outside the normal threshold of safety concerns.    On behalf of the owner, Laura Trejo, I hereby request approval to construct the septic system for the  subject property. I am happy to answer any further questions that you may have and look forward to  your response.     Sincerely,    Tim Alley, PE  Civil Engineer  The Boutet Company, Inc.  Office: (907) 357‐6760  Mobile: (907) 830‐2821  Email: talley@tbcak.com      Attachments:  On‐site Septic/Well Permit Application  Certificate of On‐Site Systems Approval  Test Hole Logs  Uplands Subdivision Phase 3 Lot 2 Plot Plan  Septic Plan and Details    ABSORPTION TRENCH/DRAINFIELD INSTALLATION: 6. EXCAVATE THE PROPOSED TRENCH TO THE DIMENSIONS SHOWN ON THE DESIGN. THE BOTTOM OF THE EXCAVATION SHALL BE WITHIN 2 INCHES OF LEVEL. IF THE SIDEWALLS OF THE EXCAVATION BECOME SMEARED, THEY MUST BE RAKED OR SCRATCHED (ROUGHED -UP) BEFORE GRAVEL (SEWER ROCK) PLACEMENT. 7. ONCE THE GRAVEL IS INSTALLED, THE DISTRIBUTION PIPE IS TO BE INSTALLED LEVEL WITH THE PERFORATIONS FACED DOWNWARD. GRAVEL IS THEN TO BE PLACED OVER THE DISTRIBU7701V PIPE TO PROVIDE A MINIMUM OF 2 INCHES OF COVER OVER THE PIPE. 8. A SILT BARRIER MUST BE INSTALLED BETWEEN THE FINAL GRAVEL LAYER AND THE NATIVE SOIL BACKFILL, ENSURE THE SILT BARRIER COVERS THE ENTIRE GRAVEL SURFACE BEFORE PLACING BACKFILL. 9. MONITOR TUBES SHALL BE OF FOUR (4) INCH DIAMETER AND INSTALLED APPROXIMATELY IN THE LOCATIONS SHOWN ON THE DESIGN. THE PORTION OF THE MONITORING TUBE EXTENDING THROUGH THE GRAVEL SHALL BE PERFORATED FROM THE BOTTOM OF THE TRENCH TO THE INVERT OF THE DISTRIBUTION PIPE THIS IS EQUIVALENT TO THE EFFECTIVE DEPTH OF THE GRAVEL AS NOTED ON THE DESIGN. 10. BACKFILL OVER THE FINAL GRAVEL LAYER MUST NOT BE LESS THAN TWENTY-FOUR (24) INCHES. INSULATION MUST BE INSTALLED WHEN THE BACKFILL DEPTH IS LESS THAN THIRTY-SIX (36) INCHES. THE FINISH GRADE OVER THE TRENCH MUST BE MOUNDED TO PREVENT THE FORMATION OF A DEPRESSION AFTER SETTLING. MATERIAL SPECIFICATIONS: 1. ANY SEPTIC TANK PROPOSED FOR INSTALLATION MUST BE CONSTRUCTED BY A MUNICIPALLY APPROVED SEPTIC TANK MANUFACTURER. 2. THE FOLLOWING PIPE MATERIALS ARE APPROVED FOR USE IN SEPTIC SYSTEM INSTALLATIONS IN THE MUNICIPALITY OF ANCHORAGE. TYPE OF PIPE PERFORATED SOLID CAST IRON YES YES ASTM D3034 (PVC) YES YES ASTM F810 (HDPE) YES NO ASTM D2662 (ABS) YES YES USE OF A TYPE OF PIPE OTHER THAN LISTED ABOVE MUST BE APPROVED BY THE INSPECTING ENGINEER. J. INSULATION SHALL BE AT LEAST 2" THICK EXTRUDED DIRECT BURIAL POLYSTYRENE (DOW CHEMICAL COMPANY STYROFOAM HI OR EQUAL). 4. SEPTIC TANK INLETS AND OUTLETS SHALL BE FITTED WITH WATERTIGHT COUPLINGS (CAULDER, FERNCO, OR EQUAL). 5. A PERMEABLE NONTOXIC SILT BARRIER (TYPAR 3401, MIRAFI 140/N, OR EQUAL) MUST BE INSTALLED BETWEEN THE FINAL LEACHFIELD GRAVEL LAYER AND THE NATIVE SOIL BACKFILL. 6. ALL LEACHFIELD GRAVEL (SEWER ROCK) SHALL BE 0.5"-2.0" SCREENED GRAVEL WITH LESS THAN 17 PASSING THE #200 SIEVE. Z WHEN SAND IS BEING USED AS A FILTER MATERIAL, ITS GRADATION SPECIFICATION MUST CONFORM TO CURRENT M.O.A. REQUIREMENTS. INSPECTIONS: PRIOR TO CONSTRUCTION OF SEPTIC SYSTEM, A TEXT HOLE WILL BE REQUIRED TO BE DUG CONFIRMING SOIL CONDITIONS WITHIN PROXIMITY OF THE REPLACEMENT ABSORPTION AREA. THE ENGINEER WILL BE REQUIRED TO OBSERVE SUBSURFACE CONDITIONS AND TO VERIFY THE DEPTH OF WATERTABLE AND ANY BEDROCK. TYPICALLY THERE WILL BE A MINIMUM OF SIX (6) INSPECTIONS REQUIRED DURING THE INSTALLATION OF THE WASTEWATER DISPOSAL SYSTEM. THESE INSPECTIONS WILL OCCUR AS FOLLOWS., 1. THE FIRST INSPECTION SHALL BE CONDUCTED PRIOR TO THE START OF CONSTRUCTION AND SHALL INCLUDE THE FOLLOWING ITEMS: 1.1. PRECONSTRUCTION MEETING BETWEEN THE CONTRACTOR AND THE ENGINEER TO DISCUSS CONSTRUCTION PROCEDURES AND DESIGN REQUIREMENTS. 1.1. VERIFY SITE CONDITIONS CONFORM TO THE DESIGN PLANS AND PERMIT 1.2. VERIFY THE PROJECT LAYOUT CONFORMS TO THE DESIGN PLANS AND PERMIT 2. AN INSPECTION SHALL BE CONDUCTED AFTER THE EXCAVATION OF ALL NATIVE MATERIAL FOR THE DISPOSAL FIELD HAS BEEN COMPLETED, BUT PRIOR TO PLACEMENT OF FILTER SAND AND DRAINROCK. THE PURPOSE OF THIS INSPECTION IS TO ALLOW VERIFICATION THAT THE NATIVE MATERIAL CONFORMS TO THE SOILS LOG AND THAT THE EXCAVATION IS TO THE CORRECT DEPTH. 3. AN INSPECTION SHALL BE CONDUCTED AFTER PLACEMENT OF THE FILTER SAND, IF UTILIZED. DESIGN: I I I I BASE I TBC I I TELEPHONE I --- TOPOGRAPHY TBC ELECTRIC --- STAKING: PROFILE --- CABLE TV --- SANITARY SEWER --- I I TRAFFIC SIGNAL I --- ASBUILT: I I ISTORM SEWER I --- I I DESIGN I TBC I \6 I\ 30' ST HOLE RADIUS - L MAIINTAIN A MINIMUM 10"\ 602 FROMPROPERTY LINE I \B00 J_ a \ \ 1 a '96\112" \ \ `7 45' X 6' ED DEEP TRENCH \ \ IE=794.50 �H3 \ - PROPOSED BLDG CFF = 816.42 \ 10' \ \ 5.00 LF 4"-0 ABS SS PIPE_'-{ - \ J JI 4" 0-45° ELBOW IE=795.61 5.56 LF 4"-0 ABS SS PIPE _ REPLACEMENT ABSORPTION AREA I PRIOR TO CONSTRUCTION OF THE PRIMARY ABSORPTION 4"-0 DOUBLE CLEANOUT E=796.86 o AREA, A TEST HOLE CONFIRMING SUBSURFACE CONDITIONS M WILL NEED TO BE CONDUCTED. IF A DIFFERING SOIL PROFILE / EXISTS, CONDUCT A PERCOLATION TEST TO SUPPORT SIZING 2.70 LF 4"-0 ABS SS PIPE OF THE REPLACEMENT ABSORPTION AREA -----,,o �806- n eoa- \\ 4" 0-90° ELBOW IE=797.18\ \ 800- 3.00 LF 4"-0 ABS SS PIPE 4"-0 CLEANOUT IE=797.24 \ \ 98- 23.60 LF 4"-0 ABS SSS PIP ANN INLET IE=797.7 �]9a \ \-TANK-OUTLET IE=797.46 7 794 - ANY VEGETATION THAT IS DISTURBED DIRECTLY DOWN NEAREST WELL LOCATED GRADIENT FROM ABSORPTION SYSTEM SHALL BE 155' \ 1 REPLACED WITH EROSION CONTROL VEGETATION -NEAREST W48', LOCATED LOT n _ N89'57'11"W 397.18' ACgsk�911'1 / The Bou tet Company, Inc. 'Si04,Aey: j 801 E. 57th Place x[702 Anchors a AK. 99518 ,Ly14o. C 1 368'r� gg 5522222 55 55 1 s •0616%Zi FxCe9Snse No52AECC957 _ 41,811 Sq. Ft. 0.960 Acres\� 20' DRAINAGE- EASEMENT J0 O m 27 \ 0 - \ 0 10 20 TREJO RESIDENCE LAURA TREJO 20900 UPPER LOWLAND AVE. SEPTIC PLAN AND NOTES EAGLE RIVER, AK HOR. 1"=10' DATE: 06/16/21 GRID: N/A Cl SCALE VER. N/A SHEET STATUS: CONSTRUCTION DRAWINGS UPPER L 0 WL D AVENUE GENERAL: 4. AN INSPECTION SHALL BE CONDUCTED AFTER PLACEMENT OF DRA/NROCK, AND INSTALLATION OF DISTRIBUTION LINES, CLEANOUTS AND L=1757 1. THE SCOPE OF THIS PROJECT INCLUDES THE INSTALLATION OF A 1250 GALLON SEPTIC TANK AND A LEACHFIELD TRENCH TO MONITOR TUBES, BUT PRIOR TO PLACEMENT OF INSULATION, SILT BARRIER, OR BACKFILL. - - - - - - - - - - L-4554 - - - - - - -R=30.00 - - - - - - - - - - SERVE THE PROPOSED FOUR BEDROOM RESIDENCE LOCATED ON THE REFERENCED PROPERTY. R=stl.o0 5. AN INSPECTION SHALL BE CONDUCTED AFTER THE SYSTEM HAS BEEN BACKFILLED TO VERIFY FINAL GRADING AND THE LOCATION OF - - - - - - - - - - - - - - - - - - - - - - - - 2. CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE APPROVED SITE PLAN AND DESIGN DRAWINGS, MUNICIPAL PERMIT WITH ANY ALL STANDPIPES. SPECIAL PROVISIONS OR CONDITIONS, AND ALL APPLICABLE STATE AND MUNICIPAL WASTEWATER DISPOSAL REGULATIONS. 6. AN INSPECTION SHALL BE CONDUCTED AFTER THE TANK IS SET IN PLACE WITH DISTRIBUTION PIPES AND CLEANOUTS INSTALLED, BUT - - 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ANY NECESSARY UNDERGROUND UTILITY LOCATES. PRIOR TO BACKFILL 4. UNLESS SPECIFICALLY AGREED OTHERWISE, THE PROPERTY OWNER SHALL BE RESPONSIBLE FOR ENSURING A SATISFACTORY 7. AN INSPECTION SHALL BE CONDUCTED AFTER THE TANK HAS BEEN BACKFILLED TO VERIFY FINAL GRADING, ELECTRICAL EQ U ENT _ VEGETATION GROWTH OVER THE MOUNDED AREA. INSTALLATION, AND THE LOCATIONS OF ALL STANDPIPES. 68 a,6\ 5. CONTRACTORS INSTALLING WASTEWATER DISPOSAL SYSTEMS MUST BE CERTIFIEDTHE MUNICIPAL HEALTH DEPARTMENT FOR SYSTEM INSTALLATIONS OWNERS INSTALLING THEIR OWN SYSTEMS MUST ALSO RECEIVE PRIOR APPROVAL FROM THE MUNICIPAL DESIGN CRITERIA: -\ HEALTH DEPARTMENT. 4 BEDROOM = 600 GPD 6. ALL FILL AND GRADING SHALL BE COMPLETED PER MOA CODE REQUIREMENTS 60 1.2 GPD/SQFT 600/1011 .2 = 500 SOFT SEPTIC TANK INSTALLATION: TRENCH DESIGN: s(0` 10' T. E.G. -EASEMENT\ 1. A SEPTIC TANK IS TO BE CONSTRUCTED BY A CERTIFIED SEPTIC TANK MANUFACTURER. ACCESS. IS TO BE CONSTRUCTED BY A 6' EFFECTIVE DEPTH - - - - CERTIFIED SEPTIC TANK CONSTRUCTION SHALL INCLUDE A 20" RISER FOR THE FIRST COMPARTMENT AND A 4" CLEANOUT FOR THE SECOND COMPARTMENT 2' WIDTH 45' LENGTH 2. THE SEPTIC TANK SHALL BE SUFFICIENTLY BEDDED TO PREVENT SETTLING OR SHIFTING OF THE TANK, REFER TO 540 SF OF ABSORPTION AREA MANUFACTURE'S SPECIFICATIONS FOR BEDDING AND INSTALLATION REQUIREMENTS. PROPERTY AND SUBDIVISION PROPERTIES SERVED BY aos� 3. ALL STANDPIPES ON THE SEPTIC TANK SHALL EXTEND A MINIMUM OF 12 INCHES ABOVE FINAL GRADE. TANK RISER TO BE SET AWWU WATER SYSTEM. AT FINAL GRADE, WITH POSITIVE DRAINAGE AROUND THE PERIMETER OF RISER COVER. NO WELLS EXIST WITHIN 100' OF SEPTIC SYSTEM. 4. SEPTIC TANKS INSTALLED WITH LESS THAN 4' OF COVER SHALL BE INSULATED. A FOUNDATION CLEANOUT SHALL BE INSTALLED ONE TO FOUR FEET FROM THE BUILDING FOUNDATION. IN THE LINE BETWEEN THE TANK AND THE LEACHFIELD THERE SHALL BE TWO ADJACENT CLEANOUTS. THESE CLEANOUTS SHALL BE LOCATED ON UNDISTURBED SOIL NOT MORE THAN 10' FROM THE TANK. THE IT\ FIRST CLEANOUT, IN LINE, SHALL BE TO CLEAN TOWARD THE LEACHFIELD. THE SECOND CLEANOUT SHALL BE TO CLEAN TOWARD THE� SEPTIC TANK. TTF \ ABSORPTION TRENCH/DRAINFIELD INSTALLATION: 6. EXCAVATE THE PROPOSED TRENCH TO THE DIMENSIONS SHOWN ON THE DESIGN. THE BOTTOM OF THE EXCAVATION SHALL BE WITHIN 2 INCHES OF LEVEL. IF THE SIDEWALLS OF THE EXCAVATION BECOME SMEARED, THEY MUST BE RAKED OR SCRATCHED (ROUGHED -UP) BEFORE GRAVEL (SEWER ROCK) PLACEMENT. 7. ONCE THE GRAVEL IS INSTALLED, THE DISTRIBUTION PIPE IS TO BE INSTALLED LEVEL WITH THE PERFORATIONS FACED DOWNWARD. GRAVEL IS THEN TO BE PLACED OVER THE DISTRIBU7701V PIPE TO PROVIDE A MINIMUM OF 2 INCHES OF COVER OVER THE PIPE. 8. A SILT BARRIER MUST BE INSTALLED BETWEEN THE FINAL GRAVEL LAYER AND THE NATIVE SOIL BACKFILL, ENSURE THE SILT BARRIER COVERS THE ENTIRE GRAVEL SURFACE BEFORE PLACING BACKFILL. 9. MONITOR TUBES SHALL BE OF FOUR (4) INCH DIAMETER AND INSTALLED APPROXIMATELY IN THE LOCATIONS SHOWN ON THE DESIGN. THE PORTION OF THE MONITORING TUBE EXTENDING THROUGH THE GRAVEL SHALL BE PERFORATED FROM THE BOTTOM OF THE TRENCH TO THE INVERT OF THE DISTRIBUTION PIPE THIS IS EQUIVALENT TO THE EFFECTIVE DEPTH OF THE GRAVEL AS NOTED ON THE DESIGN. 10. BACKFILL OVER THE FINAL GRAVEL LAYER MUST NOT BE LESS THAN TWENTY-FOUR (24) INCHES. INSULATION MUST BE INSTALLED WHEN THE BACKFILL DEPTH IS LESS THAN THIRTY-SIX (36) INCHES. THE FINISH GRADE OVER THE TRENCH MUST BE MOUNDED TO PREVENT THE FORMATION OF A DEPRESSION AFTER SETTLING. MATERIAL SPECIFICATIONS: 1. ANY SEPTIC TANK PROPOSED FOR INSTALLATION MUST BE CONSTRUCTED BY A MUNICIPALLY APPROVED SEPTIC TANK MANUFACTURER. 2. THE FOLLOWING PIPE MATERIALS ARE APPROVED FOR USE IN SEPTIC SYSTEM INSTALLATIONS IN THE MUNICIPALITY OF ANCHORAGE. TYPE OF PIPE PERFORATED SOLID CAST IRON YES YES ASTM D3034 (PVC) YES YES ASTM F810 (HDPE) YES NO ASTM D2662 (ABS) YES YES USE OF A TYPE OF PIPE OTHER THAN LISTED ABOVE MUST BE APPROVED BY THE INSPECTING ENGINEER. J. INSULATION SHALL BE AT LEAST 2" THICK EXTRUDED DIRECT BURIAL POLYSTYRENE (DOW CHEMICAL COMPANY STYROFOAM HI OR EQUAL). 4. SEPTIC TANK INLETS AND OUTLETS SHALL BE FITTED WITH WATERTIGHT COUPLINGS (CAULDER, FERNCO, OR EQUAL). 5. A PERMEABLE NONTOXIC SILT BARRIER (TYPAR 3401, MIRAFI 140/N, OR EQUAL) MUST BE INSTALLED BETWEEN THE FINAL LEACHFIELD GRAVEL LAYER AND THE NATIVE SOIL BACKFILL. 6. ALL LEACHFIELD GRAVEL (SEWER ROCK) SHALL BE 0.5"-2.0" SCREENED GRAVEL WITH LESS THAN 17 PASSING THE #200 SIEVE. Z WHEN SAND IS BEING USED AS A FILTER MATERIAL, ITS GRADATION SPECIFICATION MUST CONFORM TO CURRENT M.O.A. REQUIREMENTS. INSPECTIONS: PRIOR TO CONSTRUCTION OF SEPTIC SYSTEM, A TEXT HOLE WILL BE REQUIRED TO BE DUG CONFIRMING SOIL CONDITIONS WITHIN PROXIMITY OF THE REPLACEMENT ABSORPTION AREA. THE ENGINEER WILL BE REQUIRED TO OBSERVE SUBSURFACE CONDITIONS AND TO VERIFY THE DEPTH OF WATERTABLE AND ANY BEDROCK. TYPICALLY THERE WILL BE A MINIMUM OF SIX (6) INSPECTIONS REQUIRED DURING THE INSTALLATION OF THE WASTEWATER DISPOSAL SYSTEM. THESE INSPECTIONS WILL OCCUR AS FOLLOWS., 1. THE FIRST INSPECTION SHALL BE CONDUCTED PRIOR TO THE START OF CONSTRUCTION AND SHALL INCLUDE THE FOLLOWING ITEMS: 1.1. PRECONSTRUCTION MEETING BETWEEN THE CONTRACTOR AND THE ENGINEER TO DISCUSS CONSTRUCTION PROCEDURES AND DESIGN REQUIREMENTS. 1.1. VERIFY SITE CONDITIONS CONFORM TO THE DESIGN PLANS AND PERMIT 1.2. VERIFY THE PROJECT LAYOUT CONFORMS TO THE DESIGN PLANS AND PERMIT 2. AN INSPECTION SHALL BE CONDUCTED AFTER THE EXCAVATION OF ALL NATIVE MATERIAL FOR THE DISPOSAL FIELD HAS BEEN COMPLETED, BUT PRIOR TO PLACEMENT OF FILTER SAND AND DRAINROCK. THE PURPOSE OF THIS INSPECTION IS TO ALLOW VERIFICATION THAT THE NATIVE MATERIAL CONFORMS TO THE SOILS LOG AND THAT THE EXCAVATION IS TO THE CORRECT DEPTH. 3. AN INSPECTION SHALL BE CONDUCTED AFTER PLACEMENT OF THE FILTER SAND, IF UTILIZED. DESIGN: I I I I BASE I TBC I I TELEPHONE I --- TOPOGRAPHY TBC ELECTRIC --- STAKING: PROFILE --- CABLE TV --- SANITARY SEWER --- I I TRAFFIC SIGNAL I --- ASBUILT: I I ISTORM SEWER I --- I I DESIGN I TBC I \6 I\ 30' ST HOLE RADIUS - L MAIINTAIN A MINIMUM 10"\ 602 FROMPROPERTY LINE I \B00 J_ a \ \ 1 a '96\112" \ \ `7 45' X 6' ED DEEP TRENCH \ \ IE=794.50 �H3 \ - PROPOSED BLDG CFF = 816.42 \ 10' \ \ 5.00 LF 4"-0 ABS SS PIPE_'-{ - \ J JI 4" 0-45° ELBOW IE=795.61 5.56 LF 4"-0 ABS SS PIPE _ REPLACEMENT ABSORPTION AREA I PRIOR TO CONSTRUCTION OF THE PRIMARY ABSORPTION 4"-0 DOUBLE CLEANOUT E=796.86 o AREA, A TEST HOLE CONFIRMING SUBSURFACE CONDITIONS M WILL NEED TO BE CONDUCTED. IF A DIFFERING SOIL PROFILE / EXISTS, CONDUCT A PERCOLATION TEST TO SUPPORT SIZING 2.70 LF 4"-0 ABS SS PIPE OF THE REPLACEMENT ABSORPTION AREA -----,,o �806- n eoa- \\ 4" 0-90° ELBOW IE=797.18\ \ 800- 3.00 LF 4"-0 ABS SS PIPE 4"-0 CLEANOUT IE=797.24 \ \ 98- 23.60 LF 4"-0 ABS SSS PIP ANN INLET IE=797.7 �]9a \ \-TANK-OUTLET IE=797.46 7 794 - ANY VEGETATION THAT IS DISTURBED DIRECTLY DOWN NEAREST WELL LOCATED GRADIENT FROM ABSORPTION SYSTEM SHALL BE 155' \ 1 REPLACED WITH EROSION CONTROL VEGETATION -NEAREST W48', LOCATED LOT n _ N89'57'11"W 397.18' ACgsk�911'1 / The Bou tet Company, Inc. 'Si04,Aey: j 801 E. 57th Place x[702 Anchors a AK. 99518 ,Ly14o. C 1 368'r� gg 5522222 55 55 1 s •0616%Zi FxCe9Snse No52AECC957 _ 41,811 Sq. Ft. 0.960 Acres\� 20' DRAINAGE- EASEMENT J0 O m 27 \ 0 - \ 0 10 20 TREJO RESIDENCE LAURA TREJO 20900 UPPER LOWLAND AVE. SEPTIC PLAN AND NOTES EAGLE RIVER, AK HOR. 1"=10' DATE: 06/16/21 GRID: N/A Cl SCALE VER. N/A SHEET STATUS: CONSTRUCTION DRAWINGS CLEANOUT MAX WATER TIGHT CAP (TYP) CLEANOUT 20" RISER WITH — SECURABLE LID4- ORIGINAL GRADE 4" OF UNDERGROUND RATED INSULATION 10' MAX "0 ABS PIPE ® 2.0% MINIMUM INSTALL AND BED SEPTIC TANK PER MANUFACTURE'S SPECIFICATIONS 1250 GALLON TANK- CORROSION MATERIAL, APPROVED BY MOA 4"0 SOLID PVC PIPE TRANSITION FROM 4"0 SOLID PVC PIPE TO 4"0 PERFORATED PVC PIPE 4"0 PERFORATED PVC PIPE IF DOUBLE CLEANOUT IS LOCATED BEYOND 20' OF ABSORPTION SYSTEM, A CLEANOUT IS REQUIRED TO BE INSTALLED TO THE ONSITE WASTEWATER SYSTEM PROFILE CLEANOUT NOTES: 1. MATCH PIPE SIZE AND MATERIAL PER UTILITY PLANS. 2. DOUBLE CLEANOUT ASSEMBLY SHOWN. SINGLE CLEANOUTS ONLY TBC INCLUDE ONE RISER. MATCH DIRECTION OF PIPE FLOW. 3. PROTECT CLEANOUT ASSEMBLY DURING CONSTRUCTION FINISH GRADE z EAGLE RIVER, AK SANITARY SEWER CAP 45' ELBOW WYE CLEANOUT DETAIL DESIGN: BASE TBC TELEPHONE --- TOPOGRAPHY TBC ELECTRIC --- STAKING: PROFILE The Boutet Compy, Inc. BQ, E. 57th Ploce 702 An choggra a 55A2222K2. 559951558 FxCense CABLE TV EAGLE RIVER, AK SANITARY SEWER --- TRAFFIC SIGNAL --- ASBUILT: STORM SEWER --- DESIGN TBC CONTRACTOR: BASIS OF DATUM: WATER --- QUANTITIES TBC INSPECTOR: GAS --- CONSTRUCTION RECORD VERTICAL DATUM PLAN CHECK MONITORING TUBES IN CORNERS OF FIELD CLEANOUT 4"0 MONITORING WELL W/ REMOVABLE CAP (TYP. 2) 4"0 PVC SS PIPE FRONT— TANK ® 2.0% 4" DOUBLE CLEANOUT WITHIN 20' OF PERFORATED PIPE CLEANOUT CONNECTED TO PERORATED PIPE MONITORING TUBES IN CORNERS OF FIELD PTH FROM OG TO BOTTOM OF FIELD -9' NATIVE BACKFILL DEPTH FROM OG TO TOP OF FINISHED GRAD FIELD > 36" 12" - 1/2"0 - 2"0 SEPTIC 4"0 SOLID PVC PIPI DRAIN ROCK (NO MORE THAN 1% PASSING THE #200 SIEVE ) — — — — — - TRANSITION FROM 4"O- -SOLID �4"0 SOLID PVC PIPE PVC PIPE TO 4"0 PERFORATED PVC PIPE SEPARATION FABRIC 4"0 PERFORATED PVC -,, 4"0 PERFORATED PVC-\ PIPE 12" - 1/2"0 - 2"0 SEPTIC DRAIN ROCK (NO MORE THAN 1% PASSING THE #200 SIEVE ) 4"0 PERFORATED PVC PIPE L -WATER TABLE IMPERMEABLE SOILS 45' ABSORPTION TRENCH DETAIL (N.T.S) 4"0 END CAP (TYP) 4" CLEANOUT z 4"0 MONITORING WELL W/ REMOVABLE CAP (TYP. 2) TREJO RESIDENCE SEPTIC DETAILS TOR. 1"=20' DATE: 06/16/21 GRID: N/A C"Z SCALE VER. N/A SHEET STATUS: CONSTRUCTION DRAWINGS C'Z OF aGgs�111 �P LAURA TREJO 041: 20900 UPPER LOWLAND AVE. The Boutet Compy, Inc. BQ, E. 57th Ploce 702 An choggra a 55A2222K2. 559951558 FxCense :T'qq j ,�'fNo_ CF, 1 36S•�/ t' �0,6 16/Zi t'�'�AiOfE"`� EAGLE RIVER, AK 9SNo52AECC957 CONSULTANT SEAL 4"0 END CAP (TYP) 4" CLEANOUT z 4"0 MONITORING WELL W/ REMOVABLE CAP (TYP. 2) TREJO RESIDENCE SEPTIC DETAILS TOR. 1"=20' DATE: 06/16/21 GRID: N/A C"Z SCALE VER. N/A SHEET STATUS: CONSTRUCTION DRAWINGS C'Z DEPTH (feet) 1- 2 4 5 6 7 8 9 10- 11- 12- 13- 14- 15. 16- 17 18- 19. 20 SOILS LOG AND PERCOLATION TEST FNGIN FF RING LEGAL DESCRIPTION: UPLANDS TRACT I LOT 2 PERFORMED FOR: THE BOUTET COMPANY INC. DATE: 10/25/18 PROJECT No.: PARCEL ID#: PROPERTY ID TECHNICIAN: J. MILLETTE TEST HJ. WILLIAMS OLE 3 Rim SLOPE SITE PLAN SEE SITE PL,�N n 2 COMMENTS: DATE READING WAS GROUND WATER ENCOUNTERED? NO NET TIME (MINUTES) DEPTH TO WATER (INCHES) NET DROP (INCHES) IF YES @ WHAT DEPTH? - L 1 2:48/2:58 DEPTH OF WATER AFTER MONITORING: NONE 0 216- 2 DATE OF MONITORING: 11/4/18 P 616/816 216- 3 3:14/3:24 10 616/$16 216 COMMENTS: DATE READING GROSS TIME (MINUTES) NET TIME (MINUTES) DEPTH TO WATER (INCHES) NET DROP (INCHES) 11/23/18 TEST HOLE PRESOAKED PRIOR TO TESTING: 1 2:48/2:58 10 6 0/816 216- 2 3:02/3:12 10 616/816 216- 3 3:14/3:24 10 616/$16 216 4 3:25/3:35 10 616/$16 216 5 3:36/3:46 10 616/$16 216- 6 3:47/3:57 10 616/$16 216- PERCOLATION RATE: 4 (MIN/INCH) PERC. HOLE DIA. 6 (INCHES) TEST RUN BETWEEN: 4 FT. and 5 FT. DEPTH (f'cet) 1 - SOILS LOG AND PERCOLATION TEST E N G I N E E R I N G LEGAL DESCRIPTION: UPLANDS LOT 2 PERFORMED FOR: THE BOUTET COMPANY INC. DATE: 10/26/18 PROJECT No.: PARCEL ID#: TECHNICIAN: J. MILLETTE J. WILLIAMS TEST HOLE 4 • 4 5 6 7 GM (SANDY SILTY GRAVEL) O •` SITE PLAN SEE SITE PLAN 1 READING GROSS TIME (MINUTES) WAS GROUND WATER ENCOUNTERED? NO DEPTH To WATER (INCHES) NET DROP (INCHES) '""?` TEST HOLE PRESOAKED PRIOR TO TESTING: IF YES Ca, WHAT DEPTH? - L 2:56 / 3:03 1 1 6/12 6 DEPTH 01: WATER AFTER MONITORING: NONE 0 3:05/3:12 6:47 6/12 6 DATE OF MONITORING: I I-4-18 P 3:17/3:24 6:50 ..1 6 E 3:27/3:34 12 13 1 1 16 17 18 19 20 COMMENTS: DATE READING GROSS TIME (MINUTES) NET TIME (MINUTES) DEPTH To WATER (INCHES) NET DROP (INCHES) 11/23/18 TEST HOLE PRESOAKED PRIOR TO TESTING: 1 2:56 / 3:03 6:45 6/12 6 2 3:05/3:12 6:47 6/12 6 3 3:17/3:24 6:50 6/12 6 4 3:27/3:34 6:51 6/12 6 5 3:38 / 3:45 6:52 6/12 6 6 3:48/3:55 6:51 6/12 6 PERCOLATION RATE: 1.16 (MIN/INCH) PERC. HOLE DIA. 6 (INCHES) TEST RUN BETWEEN: 4 FT. and 5 FT.